Fulshear, TX
Home MenuResources
Engineering
Master Drainage Plan Phase II
City Council authorized the Master Drainage Plan Phase II analysis for the area south of FM 1093. This is a continuation of the previous studies performed in 2017 that included the Bois D Arc and Red Bird Lane areas and the 2018 Downtown storm sewer study. This Master Drainage Plan consolidates the previous work performed and identifies future drainage infrastructure needs for the entirety of the City limits and Extra-Territorial Jurisdiction (ETJ).
For questions or inquiries regarding the Master Drainage Plan Phase II, please email DrainageMPII@fulsheartexas.gov.