Engineering

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Master Drainage Plan Phase II

City Council authorized the Master Drainage Plan Phase II analysis for the area south of FM 1093. This is a continuation of the previous studies performed in 2017 that included the Bois D Arc and Red Bird Lane areas and the 2018 Downtown storm sewer study. This Master Drainage Plan consolidates the previous work performed and identifies future drainage infrastructure needs for the entirety of the City limits and Extra-Territorial Jurisdiction (ETJ).

For questions or inquiries regarding the Master Drainage Plan Phase II, please email DrainageMPII@fulsheartexas.gov.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer